Land Intelligence Report

Bejuco, Nandayure, Guanacaste

1,943 ha · 9.8419, -85.2398 · The capacity is present; the work is regeneration.

Terrain · shaded relief — Bejuco, Nandayure, Guanacaste
5 km
Terrain · shaded relief · AWS Terrain Tiles
Land cover · ESA WorldCover 2021 — Bejuco, Nandayure, Guanacaste
5 km
Land cover · ESA WorldCover 2021 · ESA / Copernicus

The reading in full

This 1,943-hectare parcel near Bejuco, Nandayure, Guanacaste is land with sound foundations and clear regenerative upside. It scores 57 out of 100 on the Dear Wise Earth Land Score.

The risks that most shape a decision here: Dry spells are projected to run about 88 days by 2050. A long rain-free stretch — not the yearly total — is what empties soil moisture and storage; size water storage and choose drought-tolerant planting to the dry spell, not the annual average. The terrain is steep, which constrains construction and raises erosion risk. Steep slopes increase building and road costs, limit machinery access, and make the land more prone to erosion and landslides. This area is highly exposed to projected climate change by 2050. Large shifts in temperature and rainfall can change what the land can support, so any plan should be built around the projected conditions, not current ones. A meaningful share of this land's tree cover has been cleared since 2000. Long-term loss points to historical or ongoing clearing pressure and a lower conservation baseline; confirm the legal status and whether clearing is still active.

Where the upside lies: Most of the parcel reads as tree cover. Tree cover can carry real conservation and carbon value, but satellite land-cover cannot tell natural forest from a monoculture plantation (oil palm, rubber, teak). Confirm which it is before assuming biodiversity or carbon value. A watercourse runs through the parcel. On-site water supports irrigation, livestock, and habitat and can lower water-supply costs — though it may carry buffer or setback rules worth checking.

The wider readings: Rainfall is high and supports rain-fed use. There is enough water for most crops and forestry with little or no irrigation; dry-season storage still helps. Rainfall has also been rising, which can bring more intense wet seasons; plan drainage accordingly. The area has a rich record of documented wildlife. High biodiversity adds conservation value, may bring species-protection rules, and can support eco-tourism or habitat-credit programs. No satellite soil data is available for this parcel. Soil quality cannot be assessed remotely here, so a ground survey is needed before any agricultural or restoration decision. Road and town access are close. Good access lowers development and logistics costs but can raise encroachment pressure and land prices. Official Costa Rican record places this in Lepanto, Puntarenas, Puntarenas. National cadastral and administrative data ground the parcel in the legal record — the basis for title, permitting, and tax diligence.

What the land is telling us: The longer record suggests a land that has been drawn down rather than held: about 55% of its tree cover has been cleared since 2000, most recently in 2021. It reads as recovering or fallow now, which is a workable base, but the history is the reason the foundational work comes first. Of the land's core processes, the water cycle reads as adequate to abundant, so the question is less supply than how well the land captures and holds what falls and community dynamics look rich, with a deep record of documented life nearby. What orbit cannot see is what happens below the surface — soil biology, structure, and the carbon held in the ground — so treat those as the first things to confirm underfoot. Taken together, this is land with sound foundations and clear regenerative upside. Its clearest strength to build from is that most of the parcel reads as tree cover.

57Land Score

The capacity is present; the work is regeneration.

Bejuco, Nandayure, Guanacaste

Four of five readings

soil unavailable — weight redistributed across the rest.

The parcel from orbit

Finding the latest clear satellite pass…

Reading the place

This 1,943-hectare parcel near Bejuco, Nandayure, Guanacaste is land with sound foundations and clear regenerative upside, scoring 57 out of 100. The reading that most shapes the work here is that dry spells are projected to run about 88 days by 2050. Its main strength is that most of the parcel reads as tree cover. The first move: build a water budget sized to the projected dry spell, not the annual average.

Riskmedium confidence

Dry spells are projected to run about 88 days by 2050.

A long rain-free stretch — not the yearly total — is what empties soil moisture and storage; size water storage and choose drought-tolerant planting to the dry spell, not the annual average.

Longest yearly run of days under 1 mm of rain projected near 88 days longer than today's 30-day spell (Open-Meteo daily climate).

Riskhigh confidence

The terrain is steep, which constrains construction and raises erosion risk.

Steep slopes increase building and road costs, limit machinery access, and make the land more prone to erosion and landslides.

Mean slope 2°, with 213 m of elevation change across the parcel.

Riskmedium confidence

This area is highly exposed to projected climate change by 2050.

Large shifts in temperature and rainfall can change what the land can support, so any plan should be built around the projected conditions, not current ones.

Projected change by 2050: +1 °C mean temperature, +44.7% rainfall. Exposure rated High.

Riskhigh confidence

A meaningful share of this land's tree cover has been cleared since 2000.

Long-term loss points to historical or ongoing clearing pressure and a lower conservation baseline; confirm the legal status and whether clearing is still active.

About 54.6% of the parcel lost tree cover since 2000, most recently in 2021. It held 69% tree cover in 2000. Source: Hansen Global Forest Change GFC-2023-v1.11.

Opportunitylow confidence

Most of the parcel reads as tree cover.

Tree cover can carry real conservation and carbon value, but satellite land-cover cannot tell natural forest from a monoculture plantation (oil palm, rubber, teak). Confirm which it is before assuming biodiversity or carbon value.

86% of the parcel reads as tree cover (satellite land-cover mapping). Naturalness is not verified.

Opportunityhigh confidence

A watercourse runs through the parcel.

On-site water supports irrigation, livestock, and habitat and can lower water-supply costs — though it may carry buffer or setback rules worth checking.

A mapped river or stream crosses the parcel (Río Blanco).

Waterhigh confidence

Rainfall is high and supports rain-fed use.

There is enough water for most crops and forestry with little or no irrigation; dry-season storage still helps. Rainfall has also been rising, which can bring more intense wet seasons; plan drainage accordingly.

2,973 mm of rain per year. A watercourse crosses the parcel. Up about 43% over 20 years.

Biodiversityhigh confidence

The area has a rich record of documented wildlife.

High biodiversity adds conservation value, may bring species-protection rules, and can support eco-tourism or habitat-credit programs.

5,579 biodiversity records nearby, including Coragyps atratus and Crotophaga sulcirostris (GBIF).

Soillow confidence

No satellite soil data is available for this parcel.

Soil quality cannot be assessed remotely here, so a ground survey is needed before any agricultural or restoration decision.

The SoilGrids survey returned no data for this location.

Accesshigh confidence

Road and town access are close.

Good access lowers development and logistics costs but can raise encroachment pressure and land prices.

About 0.26 km to the nearest road.

Accessmedium confidence

Official Costa Rican record places this in Lepanto, Puntarenas, Puntarenas.

National cadastral and administrative data ground the parcel in the legal record — the basis for title, permitting, and tax diligence.

Jurisdiction: Lepanto, Puntarenas, Puntarenas. Source: SNIT.

Confidence reflects the data behind each reading: high when clear passes or strong sources agree, medium on a partial or single-source signal, low where the data is sparse or indirect. A low-confidence reading usually needs one more clear pass, or a check on the ground.

What the land is telling us

The longer record suggests a land that has been drawn down rather than held: about 55% of its tree cover has been cleared since 2000, most recently in 2021. It reads as recovering or fallow now, which is a workable base, but the history is the reason the foundational work comes first.

Of the land's core processes, the water cycle reads as adequate to abundant, so the question is less supply than how well the land captures and holds what falls and community dynamics look rich, with a deep record of documented life nearby. What orbit cannot see is what happens below the surface — soil biology, structure, and the carbon held in the ground — so treat those as the first things to confirm underfoot.

Taken together, this is land with sound foundations and clear regenerative upside. Its clearest strength to build from is that most of the parcel reads as tree cover.

Where the capital goes · corridor & deployment

61Conservation priority
FrontierCore habitat

Standalone conservation value, outside the mapped network.

standalone value, outside the mapped network

Nearest declared corridor: Corredor Biológico Pájaro Campana, about 30 km · Área de Conservación Arenal-Tempisque (ACAT)

This reads as intact habitat to secure, scoring 61 out of 100 for conservation priority. It carries standalone value outside the mapped network — worth holding on its own terms. A small, low-footprint operation (fit 74/100) could fund the work from the already-worked ground.

74/100
Hospitality fit

The funding layer: a small, low-footprint operation sited on the already-worked ground, sized to carry the restoration — never spending the habitat it depends on.

Corridorlow confidence

The nearest declared corridor is the Corredor Biológico Pájaro Campana, about 30 km away (screening).

The parcel reads as outside the mapped network, so its connectivity value comes from what it holds and what protected land sits beside it rather than a corridor mandate. That corridor links Reserva Biológica Bosque Nuboso Monteverde, Golfo de Nicoya.

Nearest PNCB screening extent ~30 km. Extents are approximate — confirm against SINAC/PNCB.

Conservationmedium confidence

This reads as intact habitat — the priority is to secure it, not rebuild it.

Standing natural forest is far cheaper to protect than to restore, and holding it inside a corridor keeps the connection open. Securing tenure and legal protection is where capital does the most here.

86% tree cover, 55% cleared since 2000.

Hospitalitymedium confidence

A small hospitality operation could carry the conservation here.

In the regenerative model the lodging is a means, not the end: a low-footprint operation sited on the already-worked ground earns the revenue that funds the restoration and stewardship, while the core is left to recover. Kept small, it also gives the corridor local guardians with a reason to hold it.

Hospitality fit 74/100, drawing on standing forest, relief for views, water on site. Site any building on the disturbed matrix, not the habitat.

Capital moves

  1. 01

    Secure this land first — through purchase, or a conservation easement that survives a change of owner.

    Before committing

    Intact corridor habitat holds its value only while it stays intact; locking in protection before the land turns over is the move capital cannot undo.

    Confirm on the ground · Confirm title and boundaries with a local lawyer, then scope a servidumbre ecológica (ecological easement) and FONAFIFO's PSA forest-protection payment against the parcel.

  2. 02

    Protect the standing forest and remove the active threats to it.

    First visit

    The habitat is already here; the work is to keep it — stopping clearing, fire, and hunting pressure holds far more value than any planting would add.

    Confirm on the ground · Walk the boundary for signs of encroachment, fire, and hunting; agree the protection terms with neighbours who share the edge.

  3. 03

    Site a small, low-footprint hospitality operation on the already-worked ground to fund the stewardship.

    Once the land is secured

    A modest operation on the disturbed matrix earns the revenue that pays for the restoration and the guardians, without spending the habitat it depends on.

    Confirm on the ground · Model the operation at a size the land can carry, keep it off the habitat, and check the Certificado de Sostenibilidad Turística (CST) and local zoning before designing anything.

  4. 04

    Set a connectivity baseline and re-read it — camera traps and the species the corridor was declared for.

    Ongoing

    Funders and partners judge a corridor by whether wildlife actually moves through it; a repeatable baseline is what turns the thesis into evidence and steers the next round of capital.

    Confirm on the ground · Run camera traps and species counts on a fixed schedule — track the indicator species named for this corridor (An altitudinal corridor carrying the three-wattled bellbird's migration from the Monteverde cloud forest down to the Gulf of Nicoya mangroves).

The deployment reading is a screening lens layered on the Land Score — it points capital at the land where it builds the most connectivity, and each move is paired with the ground-truth step that confirms it. Corridor extents are approximate PNCB screening footprints; confirm a parcel against the official SINAC/PNCB record.

Best-fit regenerative model

Ecolodge / retreat

56/100 fit

Fund conservation through low-footprint hospitality.

Accessible and scenic beside standing habitat, with a hospitality fit of 74/100, this land can carry a small, low-footprint operation whose revenue funds the conservation.

Accessible, scenic land beside standing habitat. A small, low-footprint operation on the worked ground earns the revenue that pays for the restoration.

52 m elevation86% forest1.9° slope2,973 mm rain/yrcorridor ~30 km

Also consider · Corridor anchor reserve (52) · Coastal buffer · blue–green (49)

A published, rules-based suggestion read from the parcel's own indicators — forest, water, slope, access, and its place in the network. It names the shape of project the land is already set up to carry; confirm it against tenure, soils, and what you know from the ground.

What to do

  1. 01

    Build a water budget sized to the projected dry spell, not the annual average.

    First dry season

    Water, not the yearly total, is the limiting factor here; storage and drought-tolerant choices decide what the land can carry.

    Confirm on the ground · Measure the springs, wells, and watercourses at the end of the dry season, when supply is at its lowest — that is the number to plan against.

  2. 02

    Design roads and structures to the contour, and get a geotechnical and erosion assessment before any earthworks.

    Before committing

    Steep ground raises building and access costs and erosion risk; the terrain sets the layout, not the other way round.

    Confirm on the ground · Have a geotechnical engineer assess slope stability and cut-and-fill on the ground before a road line is committed.

  3. 03

    Design to the 2050 climate projections rather than today's conditions.

    First year

    The land is strongly exposed to projected change, so species, water storage, and infrastructure should be chosen for the conditions ahead.

    Confirm on the ground · Cross-check the projections against the memory of long-time residents on how the seasons have already shifted here.

  4. 04

    Ground-truth what the canopy actually is before assuming forest value.

    First visit

    Satellite land-cover cannot separate natural forest from a monoculture plantation, and the difference decides the conservation and carbon value.

    Confirm on the ground · Walk the stand: one species in rows is plantation; mixed ages and species with natural regeneration is forest. A botanist can confirm.

  5. 05

    Commission a ground soil survey before any agricultural or restoration decision.

    Before committing

    Satellites cannot read soil biology, structure, or below-ground carbon — the very things that decide what will grow — and no survey data is available here.

    Confirm on the ground · Take samples across the parcel for a lab test of organic carbon, texture, and pH, and dig a pit to read the profile and rooting depth.

Questions to sit with

  • Standing under the canopy, is it one species or many — and which parts would you protect rather than replant?
  • If the seasons here shift as the models expect, which of your intentions for the land still hold — and which need rethinking now?
  • Are you here to hold this land as it is, to work it, or to help it change — and does the reading above serve that intention?
  • If the work succeeds, what do the water, the canopy, and the people around this land look like a generation from now — and what is the first condition that has to change for that to begin?
  • Where does this reading disagree with what you have seen walking the land? That disagreement is the first thing to check on the ground.

These are not data gaps — they are the questions the data cannot answer.

Reading the land's record…

Climate · to 2050

26.5°C
Mean temp
+1.0°C
2050 Δ temp
+45%
2050 Δ rain

Exposure · High

2050 sits within a single planning horizon — about 24 years out. The models expect seasons here about 1.0°C warmerthan today's, with 45% more rain. Expect is the honest verb: this is the middle of a range of futures, not a certainty — so design to the range, not to today.

Water

2,973mm/yr
Rainfall
+42.9%
20-yr trend
On site
To watercourse

Río Blanco · Río Juan de León · Quebrada Millal · Río Bongo

Soil · 0–30 cm

Source unavailable for this parcel.

Terrain & cover

52m
Elevation
1.9°
Mean slope
86%
Forest
0%
Built
Tree cover 86%Grassland 13%

Ecology

5,579
Recorded wildlife observations
GBIF

Coragyps atratus · Crotophaga sulcirostris · Leptotila verreauxi · Zenaida asiatica

Pressure

0.3km
To road
km
To settlement

Forest history · since 2000

69%
Tree cover 2000
54.6%
Cover lost
2021
Latest loss

Hansen Global Forest Change GFC-2023-v1.11

Costa Rica ecological corridor

Nearby
Corridor
~30 km away
Área de Conservación Arenal-Tempisque (ACAT)
Conservation area

Corredor Biológico Pájaro Campana

An altitudinal corridor carrying the three-wattled bellbird's migration from the Monteverde cloud forest down to the Gulf of Nicoya mangroves.

Connects · Reserva Biológica Bosque Nuboso Monteverde · Golfo de Nicoya

PNCB / SINAC — Corredores Biológicos (screening reference) · approximate screening extent — confirm against the official SINAC / PNCB record

See the corridor network →

Costa Rica land record

Lepanto, Puntarenas, Puntarenas
Jurisdiction

SNIT Costa Rica (IGN / IDECORI) · official national data — verify title & permits locally

Talk it through with Gregorio

This reading is built from satellite and open data. It cannot see soil biology, legal tenure, or what you already know from walking the land — a 30-minute call tests the reading against the ground and sequences the work. No cost, no obligation.

Sources & method · 9 layers
Water, roads & protected areas — OpenStreetMap

Overpass (waterways, highways, places, protected areas)

vector · live
ODbL 1.0
Biodiversity — GBIF

Occurrence records (count + top species)

point · live
Mixed CC0 / CC-BY / CC-BY-NC (per dataset)
Costa Rica territorial record — SNIT

Administrative units, cadastral parcels, agrological land-capability, protected areas, Holdridge life zones (WFS)

vector (1:5 000 base) · national SDI (rolling)
SNIT Condiciones Generales de Uso (attribution)
Place — OpenStreetMap / Nominatim

Nominatim reverse geocode

settlement · live
ODbL 1.0
Terrain — AWS Terrarium (Mapzen)

Terrarium elevation tiles

~10 m (z12) · 2017
Open (attribution)
Climate — Open-Meteo

Archive 2004–2024 + MPI-ESM1-2-XR to 2050

~9 km · 2004–2024 / 2045–2049
CC-BY 4.0 (data); non-commercial API tier
Land cover — ESA WorldCover

WorldCover 2021 v200

10 m · 2021
CC-BY 4.0 (commercial promotion: notify due@esa.int)
Surface water — JRC Global Surface Water

Global Surface Water v1.4 — occurrence & seasonality

30 m · 1984–2021
Copernicus / open (attribution)
Forest loss — Hansen Global Forest Change

Global Forest Change (tree cover 2000 + annual loss)

~30 m · 2000–2023
CC-BY 4.0

Every number above is public, open data — named, dated, and licensed. What TERRA does not publish is the lens: the weights, curves, and verdict thresholds that turn these layers into a Land Score. That judgment is calibrated from land walked on the ground, and it stays proprietary.

Unavailable for this parcel: sentinel2_ndvi, sentinel1_rtc, soilgrids, worldbank_wgi, landsat_lst — the affected pillars were reweighted, not guessed.

Generated Thu, 23 Jul 2026 05:51:36 GMT · 12.1s · synthesized by TERRA.

Generated Thu, 23 Jul 2026 05:51:36 GMT · synthesized by TERRA · Dear Wise Earth.